Files

Download

Download Full Text (3.8 MB)

Description

Students are tasked with developing a well coordinated engineering design for the redevelopment of 6 Chickering Street in Lawrence, Massachusetts. The project starts with creating three different design options, which are then evaluated based on their advantages and disadvantages to determine the best option for this site. This project incorporates the five major engineering disciplines to work with existing site conditions and propose a practical and sustainable design. The work is documented into a professional report to be presented to the City of Lawrence, reflecting how engineers present and communicate designs in real-world projects.

Each discipline contributes calculations and analyses to support design decisions and ensure compliance with required codes, standards and regulations. Geotechnical reports are used to evaluate subsurface conditions that influence foundation design and site stability. Environmental assessment focuses on stormwater management, groundwater recharge, and regulatory compliance to minimize environmental impacts. Civil and structural design address the site layout, parking, and infrastructure design to ensure functionality and long-term performance.

This project also includes cost estimates for materials, construction, permitting, and environmental requirements, providing insight for feasibility and budgeting. In addition, a construction schedule is developed to outline the sequence and timing of project phases, improving coordination and efficiency. Overall, this project simulates real-world engineering practices by integrating multiple disciplines into one complete design. By comparing multiple design options, the project shows how engineering decisions are influenced by both technical requirements and economic considerations. It shows the importance of technical accuracy, sustainability, cost effectiveness, and teamwork. This experience helps students to have a better understanding of how different engineering fields work together through the design process.

Publication Date

4-30-2026

Keywords

Construction, Redevelopment, Design

6 Chickering Street, Lawrence Redevelopment

Share

COinS